+40-21-3118839 [email protected]

Sample of BIM project

The challenge here was to create an augmented reality of a little park, suggesting not only the way it will look when filled with flowers and trees species but also a forecast of the same park in 6 months time. And, to “simplify” things, this walkthrough had to...

“Depth” Electronic Archive

Electronic archiving is a pretty common process nowadays. We all want our documents to be a click away, even to be accessed wherever internet is available. It is not only about information accessibility, quite a common thing for people today, but it is also about the...

Flow Simulation Solutions in Green Building

The demands for sustainable buildings are increasing so the design goals are diversified. Nowadays engineers use renewable resources, reduce loads and boost efficiency to create products with superior performance. Fluid dynamics simulations, using a 3D building model,...

Feel the LOD of BIM

First question, is LOD the Level of Detail or Level of Development? Accepted terminology is “level of development” (and not only in AIA E202 BIM Protocol Exhibit). Anyway, there is a great difference between development and detail, like between quality and quantity of...